PRR Project Sheet · Funded by the European Union – NextGenerationEU
![]()
Identification
- Reference: UID/PRR/00326/2025
- DOI: https://doi.org/10.54499/UID/PRR/00326/2025
- Programme: Recovery and Resilience Plan (PRR), Component C05, Investment RE-C05-i13 – Scientific Research Units (Notice no. 01/C05-i13/2025)
- Intermediate beneficiary: FCT – Foundation for Science and Technology, I.P.
- Final beneficiary: University of Coimbra – Centre for Informatics and Systems of the University of Coimbra (CISUC)
- Eligible investment: €303,169.89 (funding awarded: €303,422.55)
- Execution period: 1 January 2025 – 30 June 2026
Description
The investment upgraded CISUC's research computing and storage infrastructure. It comprised GPU compute nodes for artificial intelligence, virtualisation servers, production and archive storage systems (SAN/NAS), a 25/100 GbE network with its switching, cabling and optical modules, power distribution, AI software licences, and the installation and configuration services.
The equipment is installed in the data room of the Department of Informatics Engineering, University of Coimbra (Pólo II). The four type II AI servers were procured jointly with the PRR project DIG.INTEL.
Objectives
- Provide dedicated GPU capacity for training and inference of AI models (deep learning, natural language processing, generative models).
- Give low-latency, hardware-level access for experimental research in 5G/6G networks, real-time systems, industrial IoT and security.
- Consolidate storage of research data, including confidential data that cannot be placed in the public cloud.
- Reduce CISUC's reliance on public cloud services for compute-intensive research.
Results achieved
- All equipment was delivered in April 2026, installed from May 2026, and is in operation.
- The infrastructure runs as a shared service open to all CISUC research groups, with access through VPN and institutional authentication, prioritised job queues, isolated project spaces and dedicated storage.
Software acquired
- NVIDIA AI Enterprise – per-GPU licence, 5 years (16 licences)
List last updated: 17 November 2026.
More information on the Recovery and Resilience Plan: recuperarportugal.gov.pt